Warranties

WARRANTIES FOR ALL CONCRETE WORK

JOB SPECIFICATIONS
· Three year warranty from cracking
· Three year warranty from scaling
· 5000 PSI granite concrete mix 6% air.
· Haul away all concrete & debris.
· 2″ to 4″ compacted base, all work.
· Light broom finish.
· Barricade, or tape off area.
· Concrete cure and seal; CS309
· Drain all concrete away from house, garage, or as needed to get drainage away from building.
· Expansion at house, steps, walks, driveway as needed.

WALKS / PATIOS
· Four inches of concrete.
· Walks: Two steel rods down center.
· Patios: Crisscross steel rods two foot on center.

DRIVEWAYS / GARAGE FLOOR 
· Five inches of concrete.
· Crisscross steel rods two foot on center.
· Second coat of silane base sealer to protect against salt.

STEPS / TERRACE STEPS
· 6 to 12″ of concrete thickness.
· Steps at house, drill and set rods into foundation.
· Steps: 42″ footings if needed.
· Crisscross steel rods two foot on center.

EXPOSED AGGREGATE CONCRETE
· 4000 PSI 3/8″ rock mix 6% air.
· Acid wash surface.
· Sparkle Seal surface (glossy look)
All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alterations from the above specifications involving extra cost, will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Pietigs Plus, LLC. has the right to file for Lien rights against the property worked at, to collect any moneys not paid. Warranty will be void for any balance not paid. Owner to carry fire, windstorm, hail and other necessary insurance.
· Bid may be withdrawn if not accepted in 60 days.
· 10% down and balance on completion of work.
· Workers are covered by Workman’s Compensation.
· We are licensed, bonded and insured.
Warranty does not cover any peeling from chemical or deicer use. Must be notified within 60 days of any peeling. All concrete exposed to chemicals & deicers should be sealed every 3 years. NEW concrete should NOT be exposed to deicer chemicals for 2 years. Use sand. Rock pops are not peeling.



JOB SPECIFICATIONS FOR ALL BRICK PAVERS WORK
Haul away all concrete & debris as needed to install the proper base.WALKS / PATIOS
· 5 to 6″ of Class 5 Base and Compact
· One inch of sand
· Install Pavers
· Pack pavers with tamper
· Snap Edge on sides, stake every 2 ft.
· Concrete Base 4″ with steel rods
· Brick soldier course on edges

DRIVEWAYS
· 9 to 10″ of Class 5 Base & Compact
· One inch of sand
· Fabric Underlayment
· Pack pavers with tamper
· Snap Edge on sides, stake every 2 ft.
· Concrete Base 5″ with steel rods
· Brick soldier course on edges
STEPS
· Use old steps or porch
· New concrete steps of porch with rods
· Glue pavers to tops of steps only
· Glue pavers to face & top of steps or porch
· Use PL 400 for glue

TYPES OF BRICK: 

INTERLOCK CONCRETE PAVERS 
· Holland style 4 x 8 rectangular
· Victorian style
· Roman style

BORGERT PRODUCTS 
· Holland style 4 x 8 rectangular
· Borget Cobble

ANCHOR CONCRETE PAVERS 
· Holland style 4 x 8 rectangular
· Kingstone Cobble
· Princeton rectangle/square
· Princeton CircleAll material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alterations from the above specifications involving extra cost, will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Pietgs Plus, LLC has the right to file for Lien rights against the property worked at, to collect any moneys not paid. Warranty will be void for any balance not paid. Owner to carry fire, windstorm, hail and other necessary insurance.
· Bid may be withdrawn if not accepted in 60 days.
· 10% down and balance on completion of work.
· Workers are covered by Workman’s Compensation.
· We are licensed, bonded and insured.
Warranty does not cover any peeling from chemical or deicer use. Must be notified within 60 days of any peeling. All concrete exposed to chemicals & deicers should be sealed every 3 years. NEW concrete should NOT be exposed to deicer chemicals for 2 years. Use sand. Rock pops are not peeling.